EASY ASSEMBLY


Below are all four of our designs and their assembly process


Ground Unit Assembly

Every cold frame is constructed individually, then disassembled for shipping. This assures solid construction and function. Assembly takes 10 -15 minutes. There are two side panels, a front panel, back panel, and a lid. Start by attaching the back panel to the left side panel using three galvanized screws. Next, attach the right side panel to the back panel. Attach front panel to both side panels and attach the hinges to complete your cold frame. Detailed instructions come with each cold frame.


Ground Unit with Automatic Vent

Before assembling the cold frame, attach the automatic vent to the back panel of the cold frame. Then, attach the left panel to the back panel with three galvanized screws. Continue with attaching the right side panel to the back panel. Set front in place and secure. Lay lid on top and attach the hinges to the back panel. Detailed instructions come with each cold frame.


Germination Station

The assembly begins with the table, there are four panels which attach together with galvanized screws. The soil box then rests on top of the table. Assemble the cold frame on top of the soil box.Detailed instructions come with each cold frame.


Germination Station with Automatic Vent

The assembly begins with the table, there are four panels which attach together with galvanized screws. The soil box then rests on top of the table. Before assembling the cold frame on top of the soil box, attach the automatic vent to the back panel of the cold frame.Detailed instructions come with each cold frame.

 

Video for Engaging Automatic Vent

On the right is a short video on how to engage the Bayliss Automatic Vent.